NYC DOT Weekend Traffic Advisory (2024)

This traffic alert details the locations of road construction and other events that will affect the flow of traffic this weekend. This information is subject to change. Check the Weekly Traffic Advisory Check the Special Traffic Advisory

The times listed for closures for street fairs are for the actual times of the street fairs themselves. The streets may be closed for longer to allow for set-up and breakdown. Street fair organizers are generally permitted to begin set-up at 8 am and breakdown must be completed by 7 pm.

Manhattan

East 2 Street between East Houston Street and Avenue C

This street will be closed Friday from 7 am to 4 pm through 6/5/24 to facilitate sewer installation.

West 4 Street between Greene Street and Mercer Street

This street will be closed from 9 am to 3 pm Monday to Friday through 6/11/24 for boom operation (Material Delivery).

West 24th Street between 8th Avenue and 7th Avenue

This street will be closed from 8 am to 6 pm Saturday through 6/23/24 for concrete pour.

West 25th Street between 6th Avenue and 7th Avenue

This street will be closed from 5 am to 3 pm Saturday and/or Sunday through 6/8/24 to facilitate crane operation.

West 28th Street between 9th Avenue and 10th Avenue

This street will be closed 5 am to 3 pm Saturday and Sunday through 6/16/24 to facilitate crane operation.

East 47th Street between Madison Avenue and 5th Avenue

This street will be closed from 4 am to 10 am Saturday and Sunday through 6/16/24 for building inspection from boom truck.

East 47th Street between Vanderbilt Avenue and Madison Avenue

This street will be closed 24/7 through 11/14/24 for Grand Central Terminal train shed project.

East 47th Street between Park Avenue and Vanderbilt Avenue

This street will be closed 24/7 through 11/14/24 for Grand Central Terminal train shed project.

East 48th Street between Madison Avenue and Park Avenue

This street will be closed 24/7 through 11/14/24 for Grand Central Terminal train shed project.

West 49th Street between 6th Avenue and 7th Avenue

This street will be closed from 12:01 am to 7 am Saturday and Sunday through 6/2/24 to facilitate crane operation.

East 50 Street between 2 Avenue and 1 Avenue

This street will be closed Saturday from 8 am to 6 pm and Sunday from 9 am to 6 pm through 6/9/24 to facilitate sewer repair.

East 53rd Street between Madison Avenue and 5th Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/20/24 to install sewer service.

West 54th Street between 6th Avenue and 5th Avenue

This street will be closed from 8 am to 8 pm Saturday and Sunday through 6/16/24 for artwork installation/deinstallation.

East 56th Street between 5th Avenue and Madison Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

East 69th Street between Madison Avenue and Park Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

East 69th Street between Lexington Avenue and Park Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

East 71st Street between Park Avenue and Lexington Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/2/24 for knuckle boom rigging/hoisting operation.

East 75 Street between York Avenue and 1 Avenue

This street will be closed Friday from 9 am to 4 pm through 8/11/24 to facilitate concrete pouring and knuckle boom truck operation.

East 77th Street between 2nd Avenue and 3rd Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/2/24 to repair sewer.

East 75th Street between 5th Avenue and Madison Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

East 85th Street between York Avenue and East End Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

West 88 Street between Columbus Avenue and Amsterdam Avenue

This street will be closed Friday from 9 am to 3 pm, Saturday from 8 am to 6 pm and Sunday from 9 am to 6 pm through 6/2/24 to facilitate conduit installation.

East 91st Street between 1st Avenue and York Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 7/9/24 to facilitate crane operation.

West 94th Street between Amsterdam Avenue and Columbus Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/30/24 for major gas installation.

West 95th Street between West End Avenue and Broadway

This street will be closed from 8 am to 8 pm Saturday and Sunday through 6/8/24 to facilitate crane operation.

West 95th Street between West End Avenue and Pomander Walk (Broadway)

This street will be closed from 9 am to 4 pm Friday through 5/31/24 to facilitate crane operation.

East 112th Street between Lexington Avenue and 3rd Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

West 112th Street between Broadway and Riverside Drive

This street will be closed This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/1/24 to pour concrete onto new roof deck to stabilize and reinforce existing 6 story building for Columbia University.

East 120 Street between Madison Avenue and Park Avenue

This street will be closed Friday from 9 pm to 5 am through 6/1/24 to facilitate crane operation.

East 120 Street between Park Avenue Northbound and Park Avenue Southbound

This street will be closed Friday from 9 pm to 5 am through 6/1/24 to facilitate crane operation.

West 126th Street between West 127th Street (Bend) and Morningside Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/2/24 to facilitate crane operation.

West 140th Street between Amsterdam Avenue and Hamilton Place

This street will be closed Friday from 9 am to 5 pm through 6/9/24 to facilitate crane operation.

West 162 Street between Saint Nicholas Avenue and Broadway

This street will be closed Friday from 9 am to 4 pm through 6/10/24 to facilitate crane operation.

West 202 Street between 9 Avenue and 10 Avenue

This street will be closed Saturday from 8 am to 6 pm and Sunday from 9 am to 6 pm through 6/5/24 to facilitate conduit installation.

West 212 Street between Broadway and 10 Avenue

This street will be closed Saturday from 8 am to 6 pm and Sunday from 9 am to 6 pm through 6/2/24 to facilitate crane operation.

Gramercy Park East between East 20th Street and East 21st Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/2/24 to facilitate crane operation.

King Street between Hudson Street and Greenwich Street

This street will be closed from 12:01 am Saturday to 11:59 pm Sunday through 6/2/24 to facilitate crane operation.

Battery Park Underpass (BPU) between Route 9A/West Street and FDR Drive

One tube at a time in either direction will be closed intermittently, Monday to Friday from 11 pm to 5 am next morning, through June 28, 2024, to facilitate inspection, maintenance, and repairs. Also, both northbound and southbound tubes will be intermittently closed Monday to Friday from 11 pm to 5 am through May 31, 2024, to facilitate hydrostatic testing.

Bethune Street between West Street and Washington Street

This street will be closed from 9 am to 4 pm Friday through 6/24/24 for major gas installation.

FDR Drive Southbound between Jackson Street and Cherry Street

Single-lane will be closed Friday from 11 pm to 7 am next morning, and Sunday from 11 pm to 10 am next morning. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate East Side Coastal Resiliency Project and will continue through September 11, 2026.

FDR Drive southbound at Exit 3 and 4

Single-lane southbound will be closed Monday to Thursday from 11 pm to 5:30 am next morning, Saturday from 12:01 am to 6:30 am, and Sunday from 1 am to 11 am. Double-lane southbound will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am. These closures are necessary to facilitate repairs to the underground facilities and will continue through June 15, 2024.

FDR Drive between Montgomery Street and East 15 Street

Single-lane northbound and/or southbound will be closed Monday to Thursday from 10 pm to 5 am next morning, Saturday from 12:01 am to 9 am, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate median reconstruction and will continue through August 15, 2026.

FDR Drive Southbound Entrance Ramp between East Houston Street and Delancey Street

Entrance ramp to southbound FDR will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am, through June 30, 2024, to facilitate access to the manhole/underground facilities.

FDR Drive Southbound at 74 Street

Single-lane will be closed Monday to Thursday from 11 pm to 5:30 am next morning, Friday from 11 pm to 6:30 am next morning, and Sunday from 12 am to 11 am, through June 30, 2024, to facilitate facade repairs.

FDR Drive Southbound between East 112 Street and East 12 Street

Single-lane will be closed Monday to Thursday from 11 pm to 5:30 am next morning, Saturday from 12:01 am to 6:30 am, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am. These closures are necessary to facilitate repairs to the underground facilities and will continue through May 31, 2024.

First Avenue Underpass between 40 Street and 49 Street

One tube at a time in either direction will be closed, Monday to Friday from 11 pm to 5 am next morning, through May 31, 2024, to facilitate inspection, maintenance, and repairs.

Franklin Street between Church Street and Franklin Place

This street will be closed Saturday and Sunday from 10 am to 10 pm through 6/5/24 to facilitate crane operation.

West Street between Jane Street and Horatio Street

This street will be closed from 7 am to 4 pm Friday through 6/29/24 for associated closure.

Horatio Street between West Street and Washington Street

This street will be closed from 7 am to 4 pm Friday through 6/29/24 for associated closure.

Reade Street between Elk Street and Broadway

This street will be closed from 5 am to 11:59 am Saturday and Sunday through 6/2/24 for building inspection from boom truck.

Reade Street between Centre Street and Elk Street

This street will be closed from 5 am to 11:59 am Saturday and Sunday through 6/2/24 for building inspection from boom truck.

Elk Street between Chambers Street and Reade Street

This street will be closed from 5 am to 11:59 am Saturday and Sunday through 6/2/24 for building inspection from boom truck.

Thompson Street between West 3rd Street and Bleecker Street

This street will be closed Friday from 9 am to 4 pm through 6/20/24 for booming operations.

Thompson Street between West Houston Street and Bleecker Street

This street will be closed from 9 am to 3 pm Monday to Friday through 6/19/24 for use of knuckle boom to hoist hot tub.

William Street between Liberty Street and Maiden Lane

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 for use of knuckle boom to lift sculptures.

Gouverneur Slip East between Water Street and South Street

This street will be closed Friday from 7 am to 4 pm, Saturday from 8 am to 4 pm through 6/5/24 to facilitate East Side Coast Resiliency.

Hillside Avenue between Broadway and Bogardus Place

This street will be closed Saturday from 8 am to 6 pm and Sunday from 9 am to 6 pm through 6/26/24 to facilitate major gas installation.

Jackson Street between Water Street and South Street

This street will be closed from 9 am to 4 pm Friday through 6/3/24 for east side coast resiliency.

MacDougal Street between Minetta Lane and West 3rd Street

This street will be closed from 7 am to 3 pm Monday to Friday through 6/7/24 for major gas installation.

MacDougal Street between Bleecker Street and Minetta Lane

This street will be closed from 7 am to 3 pm Monday to Friday through 6/7/24 for major gas installation.

MacDougal Street between West 8 Street and MacDougal Alley

This street will be closed Friday from 7 am to 4 pm through 6/9/24 to facilitate concrete operation.

MacDougal Street between MacDougal Alley and Washington Square North/Waverly Place

This street will be closed Friday from 7 am to 4 pm through 6/9/24 to facilitate concrete operation.

Northbound Route 9A/West Street between Warren Street and Hubert Street

Single-lane will be closed Monday to Friday from 10 pm to 5 am next morning, and Saturday and Sunday from 9 am to 6 pm. Double-lane will be closed Monday to Friday from 10 pm to 5 am next morning, Saturday from 1 am to 8 am, and Sunday from 2 am to 10 am. Triple-lane will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 8 am. These closures are necessary to facilitate Coastal Resiliency Project and will continue through July 1, 2024.

Park Avenue between East 119 Street and East 120 Street

This street will be closed Friday from 9 pm to 5 am and northbound will remain closed 24/7 through 7/1/24 to facilitate crane operation.

Park Avenue between East 120 Street and East 121 Street

This street will be closed Friday from 9 pm to 5 am and northbound will remain closed 24/7 through 7/1/24 to facilitate crane operation.

Park Avenue between East 121 Street and East 122 Street

This street will be closed Friday from 9 pm to 5 am and northbound will remain closed 24/7 through 7/1/24 to facilitate crane operation.

Park Avenue between East 122 Street and East 123 Street

This street will be closed Friday from 9 pm to 5 am and northbound will remain closed 24/7 through 7/1/24 to facilitate crane operation.

Park Avenue Tunnel Northbound at East 33 Street

This intersection will be closed Sunday from 10 pm to 6 am next morning through 6/7/24 to facilitate removal of sidewalk bridge.

Park Avenue Tunnel Northbound at East 40 Street

This intersection will be closed Sunday from 10 pm to 6 am next morning through 6/7/24 to facilitate removal of sidewalk bridge.

Park Avenue Tunnel Southbound at East 46 Street

This intersection will be closed Sunday from 11 pm to 5 am next morning through 6/7/24 to facilitate removal of sidewalk bridge.

Platt Street between Gold Street and Pearl Street

This street will be closed Friday from 7 am to 4 pm through 5/31/24 to facilitate concrete pouring.

Riverside Drive (Northbound Service Road) between West 152 Street and West 153 Street

This street will be closed 24/7 through 6/6/24 to facilitate safety operation.

Southbound Route 9A/West Street between Hubert Street and Warren Street

Single-lane will be closed Monday to Friday from 9 pm to 5 am next morning, and Saturday and Sunday from 9 am to 6 pm. Double-lane will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 9 am, and Sunday from 2 am to 10 am. These closures are necessary to facilitate Coastal Resiliency Project and will continue through July 1, 2024.

Washington Square East between Washington Place and Washington Square South

This street will be closed from 7 am to 4 pm Friday through 6/27/24 for special operations to include knuckle boom equipment.


Festivals, Parades and Events


Haitian Parade NYC

The following streets will be closed for the Haitian Parade NYC on Saturday June 1st, 2024 at the discretion of the NYPD in Manhattan.

Formation:

  • Central Park West between 86th and 72nd Street
  • 85th – 81st Streets between Columbus Avenue and Central Park West

Route:

  • Central Park West between 81st Street and 71st Street

Dispersal:

  • 71st – 67th Street between Columbus Avenue and Central Park West
  • Central Park West between 71st Street - 66th Street

St. Nicholas Avenue Fair

The following streets will be closed for the St. Nicholas Avenue Fair on Saturday June 1st, 2024 at the discretion of the NYPD in Manhattan.

  • St. Nicholas Avenue between 181st Street - 188th Street

Times Square Springfest

The following streets will be closed for the Times Square Springfest on Saturday June 1st, 2024 at the discretion of the NYPD in Manhattan.

  • 7th Avenue between 47th Street and 57th Street

Celebrate Israel Parade & Festival

The following streets will be closed for the Celebrate Israel Parade & Festival on Sunday June 2nd, 2024 at the discretion of the NYPD in Manhattan.

Embargo: Special Event Construction Embargo / May 31st, 2024 – June 2nd, 2024

Formation:

  • 5th Avenue between 52nd Street and 55th Street
  • West 52nd Street between 6th Avenue and 5th Avenue
  • East/West 52nd Street between Park Avenue and 6th Avenue
  • East/West 53rd Street between Park Avenue and 6th Avenue
  • East/West 54th Street between Park Avenue and 7th Avenue
  • East/West 55th Street between Park Avenue and 6th Avenue
  • East/West 56th Street between Park Avenue and 6th Avenue

Route:

  • 5th Avenue between 52nd Street and 74th Street

Dispersal:

  • 5th Avenue between 74th Street and 79th Street
  • East 74th Street between 5th Avenue and Madison Avenue
  • East 75th Street between 5th Avenue and Madison Avenue
  • East 76th Street between 5th Avenue and Madison Avenue
  • East 77th Street between 5th Avenue and Madison Avenue
  • East 78th Street between 5th Avenue and Madison Avenue

Philippine Independence Day Celebration Parade

The following streets will be closed for the Philippine Independence Day Celebration Parade on Sunday June 2nd, 2024 at the discretion of the NYPD in Manhattan.

Formation:

  • 37th & 38th Street between 5th Avenue and Park Avenue
  • 36th Street between Madison Avenue 5th Avenue

Route:

  • Madison Avenue between 27th Street and 38th Street

Dispersal:

  • 27th Street between 5th Avenue and Park Avenue

Festival:

  • Madison Avenue between 24th Street and 26th Street
  • 26th Street between Madison Avenue and Park Avenue

Manhattan/Queens

Ed Koch/Queensboro Bridge

Single-lane Queens-bound south upper roadway will be closed 24/7. Double-lane Queens-bound south upper roadway will be closed Tuesday to Friday from 9:30 am to 3 pm and from 8 pm to 5 am next morning. During second lane closure, one Manhattan-bound upper roadway lane will reverse to service Queens-bound traffic. Queens-bound south outer roadway will be closed Sunday to Saturday from 11 pm to 6 am next morning. These closures are necessary to facilitate replacement of upper roadway.


Manhattan/Brooklyn

Manhattan Bridge

Single-lane Manhattan-bound lower roadway will be closed Saturday from 6 am to 2 pm to facilitate bridge maintenance. At least one lane of traffic in each direction will be maintained at all times.

Brooklyn Bridge

Pearl Street entrance ramp to Brooklyn-bound (Ramp B) will be closed Tuesday to Friday from 11 pm to 5 am next morning to facilitate concrete installation at the ramp sidewalk.

Williamsburg Bridge

Single-lane Brooklyn-bound south outer roadway will be closed Tuesday to Friday from 5 am to 6 pm. Single-lane Brooklyn-bound south inner roadway will be closed Tuesday to Friday from 10 am to 3 pm. Single-lane Manhattan-bound north outer roadway will be closed Tuesday to Friday from 6 pm to 5 am next morning. Single-lane Manhattan-bound north inner roadway will be closed Tuesday to Friday from 8 pm to 5 am next morning. These closures are necessary to facilitate Structural Strengthening and rehabilitation.


Manhattan/Bronx

Madison Avenue Bridge over Harlem River

Single-lane at a time in either direction will be closed Monday to Friday from 10 am to 2 pm. Single-lane in both directions will be closed Monday to Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 7 am next morning. Bridge will be fully closed Monday to Friday from 12:01 am to 5 am. Bronx-bound will be closed Saturday from 12:01 am to 6 am and Manhattan-bound will be closed Saturday from 12:01 am to 7 am. These closures are necessary to facilitate bridge rehabilitation and will continue through June 30, 2024. Motorist may use 145 Street Bridge as an alternate route.

Broadway Bridge over the Harlem River

Right lane in both directions will close Monday to Friday from 7 am to 3 pm and alternating center lane in either direction will close Monday to Friday from 10 am to 2 pm through June 7, 2024, to facilitate rope cable cleaning, machinery repairs, and electrical conduit installation. Alternating sidewalk closures will be in effect.

Washington Bridge over the Harlem River (181 Street)

Single-lane Manhattan-bound will be closed Monday to Friday from 12:01 am to 5 am through May 24, 2024, to facilitate installation of concrete barrier for the protected bike lane.


Bronx

East 153 Street between Bergen Avenue and 3 Avenue

This street will be closed Friday from 9 am to 4 pm through 6/10/24 to facilitate crane operation.

East 159 Street between Cortlandt Avenue and Melrose Avenue

This street will be closed Monday to Friday from 9 am to 4 pm through 6/27/24 for new building pouring concrete.

West 169th Street between Nelson Avenue and Shakespeare Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/1/24 for use of knuckle boom and concrete pump operations.

East 176th Street between Anthony Avenue and East Tremont Avenue

This street will be closed from 9 am to 6 pm through 6/13/24 to facilitate crane operation.

East 177th Street between Grand Concourse and Morris Avenue

This street will be closed from 9 am to 3 pm Monday to Friday through 6/12/24 for new building construction.

East 179 Street between Washington Avenue and Park Avenue East

This street will be closed Friday from 9 pm to 5 am next morning through 5/31/24 to facilitate Micro Pile installation.

East 180 Street between Anthony Avenue and Ryer Avenue

This street will be closed Friday from 9 am to 2 pm and Saturday from 8 am to 4 pm through 6/3/24 to facilitate crane operation.

East 196th Street between Briggs Avenue and Bainbridge Avenue

This street will be closed from 4 pm to 11:59 pm Monday to Friday through 7/24/24 for tele handler for facade and roof work.

West 262nd Street between Huxley Avenue and Broadway

This street will be closed from 8 am to 5 pm Monday to Friday through 6/30/24 for use of concrete pumps, boom trucks and knuckle boom.

Inwood Avenue between West 169th Street and Clarke Place West

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/9/24 to facilitate crane operation.

Monroe Avenue between East 173rd Street and East 174th Street

This street will be closed from 9 am to 2 pm Monday to Friday through 6/15/24 to facilitate crane operation.

Carter Avenue between East 176th Street and East Tremont Avenue

This street will be closed from 9 am to 6 pm Monday to Friday through 6/13/24 to facilitate crane operation.

Ryer Avenue between East Burnside Avenue and East 180th Street

This street will be closed from 9 am to 6 pm Monday to Friday, and Saturday from 8 am to 6 pm through 6/24/24 to facilitate crane operation.

Bathgate Avenue between East 182nd Street and East 181st Street

This street will be closed from 9 am to 2 pm Monday to Friday, and 9 am to 6 pm Sunday through 6/25/24 for concrete pouring and booming operations.

Amethyst Street between Sagamore Street and Rhinelander Avenue

This street will be closed Friday from 9 am to 4 pm through 6/9/24 to facilitate crane operation.

Andrews Avenue between Hall of Fame Terrace and West 183 Street

This street will be closed from 6 pm to 2 am Monday to Friday through 6/29/24 for boom truck for lifting materials to school building.

Andrews Avenue between West 176th Street and West Tremont Avenue

This street will be closed from 9 am to 2 pm Monday to Friday, Saturday from 8 am to 4 pm through 6/1/24 hoisting and pumping operations.

Anthony Avenue between East 176 Street and East 175 Street

This street will be closed Friday from 9 am to 4 pm through 6/11/24 to facilitate crane operation.

Belmont Avenue between East 176th Street and Dead End

This street will be closed from 9 am to 5 pm Monday to Friday, and Saturday from 8 am to 4 pm through 6/3/24 for new building construction.

Villa Avenue between East 205th Street and Van Cortlandt Avenue East

This street will be closed 8 am to 5 pm Monday to Friday through 8/12/24 for use of boom and knuckle boom to work on new building.

Creston Avenue between 196th Street and East Kingsbridge Road

This street will be closed from 9 am to 4 pm Friday through 7/24/24 to facilitate crane operation.

Corlear Avenue between West 240 Street and West 238 Street

This street will be closed from 9 am to 3 pm Monday to Friday through 6/22/24 to lift materials to roof top.

Weiher Court between Washington Avenue and 3rd Avenue

This street will be closed from 8 am to 4 pm Monday to Friday through 5/31/24 for use of crane to erect new building.

Cruger Avenue between Sagamore Street and Bronxdale Avenue

This street will be closed from 8 am to 5 pm Friday through 6/28/24 for MTA contract C-35311 work zone and MP 6.

Glebe Avenue between Westchester Avenue and Lyon Avenue

This street will be closed from 9 am to 3 pm Monday to Friday through 6/27/24 to facilitate crane operation.

Cross Bronx Expressway between Arthur Avenue and Clay Avenue

Single-lane in both directions will be closed Monday to Friday from 12:01 am to 5 am and double-lane will be closed from 1 am to 5 am through August 30, 2024, except holidays, to facilitate in-depth inspections.

Entrance Ramp from Southbound Sheridan Boulevard (NY-895) to Westbound Bruckner Expressway (I-278)

This ramp will be closed through December 24, 2024, to facilitate Hunts Point Interstate Access Improvement Project. Trucks and buses are advised to use the exit ramp towards Edgewater Road/Hunts Point Market and follow the detour signs and use the Leggett Avenue entrance ramp to westbound Bruckner Expressway. Cars are advised to use the temporary exit ramp towards Whitlock Avenue and follow the detour signs to westbound Bruckner Expressway.

Gerard Avenue between East 150th Street and East 151st Street

This street will be closed from 9 am to 4 pm Monday to Friday, and 8 am to 4 pm Saturday through 6/16/24 for new building construction.

Grand Concourse Bridge over Metro North Railroad Hudson Line between 151 Street and 153 Street

Two lanes of traffic in both directions are shifted to the southbound lanes and structural steel repair work will continue through May 31, 2024, Monday to Friday from 7 am to 3:30 pm and 9 pm to 5 am next morning.

Honeywell Avenue between East 178 Street and East 179 Street

This street will be closed Friday from 9 am to 2 pm through 6/1/24 to facilitate concrete pump and knuckle boom operation.

Jerome Avenue/Plaza Dr. between Elliot Place and Marcy Place

This street will be closed from 9 am to 2 pm Monday to Friday through 6/13/24 for use of boom, knuckle boom and concrete pump to work on new building.

Sackett Avenue between Hone Avenue and Paulding Avenue

This street will be closed from 9 am to 4 pm Friday through 6/11/24 for drainage tie in an existing manhole in the street.

Hutchinson River Parkway Northbound between Exit 1B (East Tremont/Westchester Avenues) and Entrance ramp from Hutchinson River Parkway East

Single-lane northbound will close Monday to Thursday from 9 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 11 pm to 3 pm next day, and Saturday from 11 pm to 2 pm next day. Double-lane northbound will close Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate Westchester Avenue Bridge reconstruction and will continue through June 30, 2024.

Hutchinson River Parkway Southbound between Exit 1C (Pelham Parkway) and Entrance ramp from Westchester Avenue

Single-lane southbound will close Monday to Thursday from 10 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 10 pm to 6 am next morning, and Saturday from 10 pm to 2 pm next day. Double-lane southbound will close Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6:30 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate Westchester Avenue Bridge reconstruction and will continue through June 30, 2024.

Major Deegan Expressway (northbound) between Exit 3 and Entrance ramp north of East 138 Street

Right-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025 to facilitate East 138 Street Bridge replacement. Full closure may occur Monday to Friday between 12 am and 5 am for demolition and erection of the superstructure.

Major Deegan Expressway (southbound) between Exit 3 and Entrance ramp south of East 138 Street

Right-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025 to facilitate East 138 Street Bridge replacement. Southbound exit ramp to 138 Street bridge will be closed Monday to Friday from 11 pm to 5 am, Friday from 11 pm to 6 am next morning, Saturday from 11 pm to 9 am next morning, and Sunday from 11 pm to 5 am next morning to facilitate water main connections.

Shore Road Bridge over the Hutchinson River

Single-lane northbound will be closed Monday to Friday from 7 am to 9 am and single-lane in both directions will be closed from 9 am to 1 pm and 10 pm to 7 am next morning through June 28, 2024 to facilitate maintenance. One lane of traffic in each direction will be maintained at all times.

Park Avenue between East 138th Street and East 135th Street

This street will be closed from 7 am to 6 pm Monday to Friday through 6/30/24 for all superstructure operations.

Park Avenue East between East 178 Street and East 179 Street

This street will be closed Friday from 9 pm to 5 am next morning through 5/31/24 to facilitate Micro Pile installation.

Park Avenue East between East 180 Street and East 179 Street

This street will be closed Friday from 9 pm to 5 am next morning through 5/31/24 to facilitate Micro Pile installation.

Park Avenue West between East 180 Street and East 179 Street

This street will be closed Friday from 9 pm to 5 am next morning through 5/31/24 to facilitate Micro Pile installation.

Ryer Avenue between East 180th Street and East Burnside Avenue

This street will be closed Friday from 9 am to 2 pm through 7/14/24 to facilitate deliveries.

Whitlock Avenue between Aldus Street and East 165th Street

This street will be closed 8 am to 6 pm Saturday through 6/4/24 to facilitate crane operation.

Whitlock Avenue between Westchester Avenue and Lowell Street

This street will be closed from 5 am to 9 pm Saturday and Sunday through for mainline track repairs.


Brooklyn

South 3rd Street between Bedford Avenue and Driggs Avenue

This street will be closed from 9 am to 4 pm Friday through 6/11/24 for booming and concrete operations.

South 9th Street between Berry Street and Bedford Avenue

This street will be closed from 9 am to 4 pm Friday through 6/4/24 for material booming and concrete pouring.

North 9th Street between Kent Avenue and Wythe Avenue

This street will be closed from 9 am to 4 pm Friday through 6/1/24 to facilitate crane operation.

East 9th Street between Kings Highway and Quentin Road

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of concrete pump, knuckle boom for new building construction.

12th Street between 4th Avenue and 5th Avenue

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for hoisting and pumping operations.

West 15th Street between Surf Avenue and Mermaid Avenue

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for telescopic lift.

East 18th Street between Kings Highway and Quentin Road

This street will be closed from 9 am to 4 pm Friday through 6/1/24 for use of boom, knuckle boom and concrete pump to work on new building.

25 Street between 4 Avenue and 5 Avenue

This street will be closed Friday from 9 am to 4 pm through 6/8/24 to facilitate crane operation.

East 49th Street between Winthrop Avenue and Rutland Road

This street will be closed from 7 am to 10 pm Saturday and Sunday through 6/9/24 to facilitate crane operation.

East 49th Street between Rutland Road and Winthrop Street

This street will be closed 9 am to 4 pm Friday through 5/31/24 to inspect sewer and repair collapsed roadway.

57th Street between 20th Avenue and 21st Avenue

This street will be closed from 9 am to 4 pm Friday through 8/13/24 to facilitate crane operation.

62nd Street between 13 Avenue and 14 Avenue

This street will be closed from 9 am to 4 pm Friday through 8/21/24 for use of boom, knuckle boom and concrete pump to work on new building.

82 Street between 21 Avenue and Bay Parkway

This street will be closed Friday from 9 am to 4 pm through 8/6/24 to facilitate crane operation.

7 Avenue Bridge over LIRR between 64 Street and 62 Street

Approximately 60 parking spaces will be eliminated on 17 Avenue between 62 and 64 Streets and travel lanes will be shifted to the parking lanes, Monday to Friday from 7 am to 6 pm, through June 28, 2024, to facilitate bridge rehabilitation.

18 Avenue Bridge over LIRR between 52 Street and 54 Street

Approximately 40 parking spaces will be eliminated on 18 Avenue between 52 and 54 Streets and travel lanes will be shifted to the parking lanes, Monday to Friday from 9 am to 4 pm. Approximately 18 parking spaces will also be eliminated on 53 Street between 17 and 19 Avenues. These closures are necessary to facilitate 18 Avenue bridge rehabilitation and will continue through June 28, 2024.

Brooklyn-Queens Expressway between Atlantic Avenue and Sands Street

Queens-bound will be closed from Saturday 2 am to Monday 4 am, to facilitate critical repairs of the triple cantilever structure. Queens-bound Brooklyn-Queens Expressway entrance ramps at Atlantic Avenue, 3 Avenue, Prospect Expressway, and Hamilton Avenue, will also be closed. Motorists may use the Tillary Street entrance ramp to access Queens-bound mainline. On Atlantic Avenue between Clinton Street and Boerum Place, south side parking lane will accommodate right and thru traffic while two eastbound lanes will be dedicated to left-turn traffic onto Boerum Place.

Brooklyn-Queens Expressway Queens-bound between Atlantic Avenue and Washington Street

Right-lane and entrance ramp from Atlantic Avenue will be closed Monday to Friday from 12:01 am to 5 am through May 31, 2024 to facilitate core extraction and testing.

Carroll Street between 6th Avenue and 7th Avenue

This street will be closed from 8 am to 5 pm Saturday through 6/1/24 to facilitate crane operation.

Carroll Street between Bond Street and Body of Water

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of concrete pump and knuckle boom truck.

Carroll Street between Nevins Street and 3rd Avenue

This street will be closed from 9 am to 4 pm Friday through 6/14//24 for lifting parking equipment.

Chapel Street between Jay Street and Flatbush Avenue Exit

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of concrete pump and knuckle boom truck.

Clinton Street between Degraw Street and Kane Street

This street will be closed from 9 am to 4 pm Friday through 6/4/24 for use of knuckle boom.

Clinton Street between Pierrepont Street and Cadman Plaza West

This street will be closed from 9 am to 4 pm Friday through 7/16/24 to facilitate crane operation.

Clay Street between Franklin Street and Manhattan Avenue

This street will be closed from 9 am to 4 pm Friday through 7/31/24 for concrete pump and knuckle boom operations.

Dupont Street between Franklin Street and Manhattan Avenue

This street will be closed from 9 am to 4 pm Friday through 7/31/24 for concrete pump and knuckle boom operations.

Dean Street between Franklin Avenue and Classon Avenue

This street will be closed from 9 am to 4 pm Friday through 6/7/24 for use of boom, knuckle boom and concrete pump to work on new building.

Debevoise Avenue between Maspeth Avenue and Jackson Street

This street will be closed from 9 am to 4 pm Friday through 6/5/24 to hoist and erect structural steel and building materials.

Douglass Street between 4th Avenue and 3rd Avenue

This street will be closed from 9 am to 4 pm Friday through 7/11/24 to facilitate crane operation.

Eckford Street between Driggs Avenue and Engert Avenue

This street will be closed Friday from 9 am to 4 pm through 8/6/24 to facilitate knuckle boom operation.

Eldert Street between Knickerbocker Avenue and Irving Avenue

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for use of man lift to remove building facade.

Fleet Place between Willoughby Avenue and Myrtle Avenue

This street will be closed Saturday from 8 am to 6 pm and Sunday from 9 am to 6 pm through 6/9/24 to facilitate manhole installation.

Gallatin Place between Livingston Street and Fulton Street

This street will be closed from 9 am to 4 pm Friday through 7/27/24 for new building.

Grand Avenue between Fulton Street and Lefferts Place

This street will be closed from 9 am to 4 pm Friday through 7/8/24 for gas main installation.

Grand Avenue between Fulton Street and Putnam Avenue

This street will be closed from 9 am to 4 pm Friday through 7/8/24 for gas main installation.

Hart Street between Wyckoff Avenue and Irving Avenue

This street will be closed Friday from 7 am to 4 pm through 8/4/24 to facilitate crane operation.

Hart Street between Broadway and Stuyvesant Street

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for concrete pump usage.

Rutledge Street between Harrison Avenue and Broadway

This street will be closed from 9 am to 4 pm Friday through 8/23/24 for concrete pumps, boom, knuckle boom to work on new building.

Havens Place between Herkimer Street and Atlantic Avenue

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service.

Herkimer Street between Havens Place and Van Sinderen Avenue

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service to 2440 Fulton Street.

Herkimer Street between Havens Place and Intersection

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service.

Herkimer Street between Havens Place and Jardine Place

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service.

India Street between Body of water (Dead End) and West Street

This street will be closed from 7 am to 6 pm Monday to Friday through 7/31/24 for large concrete pours.

Sackett Street between Bond Street and Gowanus Canal/Body of water

This street will be closed from 7 am to 6 pm Monday to Friday through 8/27/24 to assist with (2) new building operations.

Lawrence Street between Fulton Street and Willoughby Street

This street will be closed from 9 am to 4 pm Friday through 7/27/24 for boom, knuckle boom and concrete pump to work on new building.

Lott Street between Tilden Avenue and Beverly Road

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for concrete pump and knuckle boom.

Dwight Street between Dikeman Street and Coffey Street

This street will be closed from 9 am to 4 pm Friday through 8/24/24 to facilitate crane operation.

New Jersey Avenue between Jamaica Avenue and Fulton Street

This street will be closed from 9 am to 4 pm through 6/30/24 for use of boom truck and concrete boom.

Richardson Street between Lorimer Street and Union Avenue

This street will be closed from 9 am to 4 pm Friday through 7/8/24 to facilitate crane operation.

Sanford Street between Myrtle Avenue and Park Avenue

This street will be closed from 9 am to 4 pm Friday through 7/4/24 to facilitate crane operation.

Van Sinderen Avenue between Herkimer Street and Fulton Street

This street will be closed from 7 am to 6 pm Saturday through 6/17/24 for major service.

Vermont Street between Jamaica Avenue and Fulton Street

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of boom truck and concrete boom.

Park Circle Service Road between Ocean Parkway and Prospect Park SW

This street will be closed from 9 am to 4 pm Friday through 8/17/24 for corresponding permit# B01-2024109-C13.

Withers Street between Humboldt Street and Grahan Avenue

This street will be closed from 9 am to 4 pm Friday through 8/21/24 for booming and concrete pouring for new building project.


Festivals, Parades and Events


International Children’s Parade and Festival

The following streets will be closed for the International Children’s Parade and Festival on Sunday June 2nd, 2024 at the discretion of the NYPD in Brooklyn.

Formation & Route:

  • Graham Avenue between Metropolitan Avenue and Grand Street

Dispersal & Festival:

  • Graham Avenue between Debevoise Street and Broadway

5th Avenue Festival

The following streets will be closed for the 5th Avenue Festival on Sunday June 2nd, 2024 in Brooklyn.

Location(s):

  • 5th Avenue between Bay Ridge Avenue and 85th Street

Queens

12 Street between Broadway and 31 Avenue

This street will be closed from 9 am to 4 pm Friday, and 8 am to 4 pm Saturday through 6/19/24 for 36” gas transmission main installation.

12 Street between 33 Avenue and Broadway

This street will be closed from 9 am to 4 pm Friday, and 8 am to 4 pm Saturday through 6/19/24 for 36” gas transmission main installation.

12 Street between 33 Avenue and 33 Road

This street will be closed Friday, Saturday, and Sunday from 8 am to 4 pm through 6/15/24 to facilitate Gas Transmission Main excavation and installation.

12 Street between 33 Road and 34 Avenue

This street will be closed Friday, Saturday, and Sunday from 8 am to 4 pm through 6/15/24 to facilitate Gas Transmission Main excavation and installation.

27th Street between Queens Plaza North and 41st Avenue

This street will be closed from 10 pm Friday to 11:59 pm Sunday through 6/2/24 to facilitate crane operation.

41 Avenue between Warren Street and Junction Boulevard

This street will be closed from 9 am to 3:30 pm Friday through 6/13/24 to lift materials to roof top.

44 Street between 34 Avenue and 35 Avenue

This street will be closed from 9 am to 4 pm Friday through 6/28/24 for concrete pouring.

42nd Road between 24th Street and 23rd Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/23/24 to facilitate crane operation.

45 Street between 34 Avenue and Northern Boulevard

This street will be closed from 9 am to 4 pm Friday through 6/28//24 for concrete pouring.

47th Avenue between 69th Street and 70th Street

This street will be closed from 7 am to 6 pm Monday to Friday through 7/31/24 for DDC SE859 reconstruct combined sewers and water main on 70th Street.

49th Street between 50th Avenue and 48th Avenue

This street will be closed 24/7 through 6/23/24 to facilitate crane operation.

72nd Street between 53rd Road and Grand Avenue

This street will be closed from 9 am to 4 pm Friday through 7/31/24 for DDC SE859 reconstruction combined sewers and watermain on 70th Street.

78 Avenue between Austin Street and Kew Forest Lane

This street will be closed Friday from 9 am to 4 pm (during school recess), Friday from 9 am to 2 pm (during school season), and Saturday from 8 am to 4 pm through 5/31/24 to facilitate concrete pump, deliveries, and boom operation.

97 Avenue between Waltham Street and Sutphin Boulevard

This street will be closed Friday from 9 am to 4 pm through 6/7/24 to facilitate crane operation.

150th Street between Archer Avenue and 94th Avenue

This street will be closed from 10 pm to 5 am weeknights through 6/3/24 for continued work on LIRR structure.

Beach 106 Street between Rockaway Beach Boulevard and Rockaway Freeway (NYCTA)

This street will be closed Friday from 7 am to 6 pm through 6/10/24 to facilitate crane operation.

Belt Parkway in the vicinity of the Springfield Boulevard Bridge overpass

Single-lane will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 1 am to 5 am through June 14, 2024, to facilitate Springfield Boulevard Bridge rehabilitation. One lane in each direction will be maintained.

Belt Parkway/Laurelton Parkway

Shoulder and adjacent lane in both directions will be closed Monday to Friday from 10 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.

Belt Parkway between Exit 21B and Exit 20

Single-lane westbound will be closed Monday to Thursday from 10 am to 2 pm and 10 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.

Belt Shore Parkway near 130 Street

Single-lane in both directions will be closed Monday to Friday from 1 am to 5 am. Single-lane eastbound will be closed Saturday from 1 am to 7 am and Sunday from 2 am to 8 am. Single-lane westbound will be closed Saturday from 1 am to 6 am and Sunday from 2 am to 9 am. During westbound closure, single-lane on the westbound entrance ramp at 135 Street will also be closed. These closures are necessary to facilitate rehabilitation of 130 Street Bridge and will continue through June 30, 2024.

Clearview Expressway between Throgs Neck Bridge and 500 feet south of Grand Central Parkway

Shoulder and adjacent lane in both directions will be closed Monday to Friday from 9 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.

Francis Lewis Boulevard Bridge over Belt System Laurelton Parkway

Single-lane in both directions on the bridge and west sidewalk will be closed Monday to Friday from 9 am to 4 pm. One lane in each direction will be maintained. Single-lane in both directions on the Belt System Lauralton Parkway underpass will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 1 am to 5 am. One lane in each direction will be maintained. These closures are necessary to facilitate Francis Lewis Boulevard bridge underdeck rehabilitation and will continue through June 28, 2024.

Cross Island Parkway (entire length)

Shoulder and adjacent lane in both directions will be closed Monday to Friday from 10 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.

Grand Central Parkway between RFK Bridge and Nassau County Line

Shoulder and adjacent lane will be closed Monday to Friday from 10 am to 2 pm on the eastbound and from 10 am to 3 pm on the westbound, through November 1, 2024, to facilitate electrical repairs.

Grand Central Parkway between Long Island Expressway and 62 Drive Pedestrian Bridge over Grand Central Parkway

Single-lane in both directions will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 12:01 am to 5 am. Lane reduction from 18 feet to 11 feet wide will occur Monday to Friday from 10 pm to 5 am next morning on the eastbound Collector Distributor Road ramp from eastbound Grand Central Parkway to eastbound Long Islang Expressway. Lane reduction from 15 feet to 10 feet wide will occur Monday to Friday from 12:01 am to 5 am on the ramp from eastbound Grand Central Parkway to eastbound Long Island Expressway. These closures are necessary to facilitate flood mitigations and will continue through June 30, 2024.

Grand Central Parkway between 47 Street and Hazen Street

Single-lane in both directions will be closed Monday to Friday from 10 pm to 5 am next morning through June 30, 2024 to facilitate flood mitigation.

Hunters Point Avenue Bridge over Dutch Kills between 27 Street and 29 Street

Bridge will be reduced to one travel lane to accommodate alternating eastbound and westbound traffic, Monday to Friday from 9 am to 4 pm, Saturday and Sunday from 7 am to 5 pm. These closures are necessary to facilitate paint removal and will continue through August 21, 2024.

Long Island Expressway between Clearview Expressway and Springfield Boulevard

Single-lane eastbound mainline will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 11 am next morning. Double-lane eastbound mainline will be closed Monday to Friday from 1 am to 5 am , Saturday from 1 am to 7 am, and Sunday from 2 am to 9 am. Single-lane westbound mainline will be closed Monday to Friday from 10 am to 3 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound mainline will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. Single-lane of service road (Horace Harding Expressway) eastbound will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 11 am next morning. Single-lane of service road (Horace Harding Expressway) westbound will be closed Monday to Friday from 10 am to 3 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. These closures are to facilitate replacement of Oceania Street Bridge and will continue through September 30, 2024.

Long Island Expressway between Van Wyck Expressway and Grand Central Parkway

Single-lane westbound on the mainline and service road will be closed Monday to Friday from 10 pm to 5 am next morning. Single-lane eastbound will be closed Monday to Friday from 11 pm to 6 am next morning. Ramp from eastbound service road to eastbound Grand Central Parkway will be closed Monday to Friday from 12:01 am to 5 am and motorists are advised to detour to next entrance ramp by 72 Road. These closures are necessary to facilitate flood mitigations and will continue through June 30, 2024.

Long Island Expressway between Queens Midtown Tunnel and Nassau County Line

Shoulder and adjacent lane will be closed Monday to Friday from 10 am to 2 pm on the eastbound and from 10 am to 3 pm on the westbound, through November 1, 2024, to facilitate electrical repairs.

Long Island Expressway between Queens Midtown Tunnel and Maurice Avenue

Single-lane eastbound will be closed Monday to Friday from 10 am to 2 pm and from 11 pm to 6 am next morning, Saturday from 12:01 am to 10 am, and Sunday from 12:01 am to 11 am and from 10 pm to 6 am next morning. Double-lane eastbound will be closed Monday to Friday from 1 am to 6 am, Saturday from 2 am to 8 am, and Sunday from 2 am to 8 am. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 10 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 7 am next morning, Saturday from 10 pm to 10 am next morning, and Sunday from 10 pm to 5 am next morning. Double-lane westbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 7 am. Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. These closures are necessary to facilitate installation of ATDM and ITS equipment and will continue through September 27, 2024.

Long Island Expressway between Maurice Avenue and College Point Boulevard

Single-lane eastbound will be closed Monday to Friday from 10 am to 2 pm and from 11 pm to 6 am next morning, Saturday from 12:01 am to 7 am, and Sunday from 12:01 am to 9 am. Double-lane eastbound will be closed Monday to Friday from 1 am to 6 am, Saturday from 2 am to 7 am, and Sunday from 2 am to 7 am. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 10 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 6 am next morning, and Saturday from 11 pm to 6 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 6 am. Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. These closures are necessary to facilitate installation of ATDM and ITS equipment and will continue through September 27, 2024.

Long Island Expressway between College Point Boulevard and City Line

Single-lane eastbound will be closed Monday to Thursday from 10 am to 2 pm and from 11 pm to 5 am next morning, Friday from 10 am to 2 pm and from 11 pm to 7 am next morning. Saturday from 11 pm to 11 am next morning. Double-lane eastbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 9 am. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 11 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. These closures are necessary to facilitate installation of ATDM and ITS equipment and will continue through September 27, 2024.

Nassau Expressway between Cross Bay Boulevard Entrance Ramp and Exit 2N

Single-lane eastbound will be closed Monday to Thursday from 10 am to 3 pm and 9 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, and Saturday from 10 pm to 7 am next morning. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 7 am, and Sunday from 12:01 am to 7 am. Eastbound Exit Ramp 2S will be closed Monday to Thursday from 11 pm to 7 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 7 am next morning. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.

Penrod Street between 108th Street and Horace Harding Expressway

This street will be closed from 8 am to 4 pm Saturday through 6/30/24 for DEP contract PS-277 108th Street pump station reconstruction.

South Conduit Avenue Eastbound between Linden Boulevard and Cross Bay Boulevard Bridge

Single-lane will be closed Monday to Friday from 9 pm to 12 am and double-lane will be closed from 12:01 am to 5 am. Single-lane will be closed Saturday and Sunday from 12:01 am to 5 am and double-lane will be closed from 12:01 am to 7 am. These closures are necessary to facilitate lead paint removal on the Cross Bay Boulevard Bridge and will continue through June 30, 2024. At least one lane will be maintained at all times.

Van Wyck Expressway Viaduct Rehabilitation

Single-lane in both directions will be closed Monday to Thursday from 10 pm to 5 am next morning, Saturday and Sunday from 1 am to 6 am. Double-lane in both directions will be closed Monday to Friday from 1 am to 5 am, Saturday and Sunday from 2 am to 6 am. These closures are necessary to facilitate bridge rehabilitation and will continue through September 30, 2024.

Van Wyck Expressway

Single-lane in both directions will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 6 am, Friday from 11:59 pm to 8 am, Saturday from 11 pm to 10 am, and Sunday from 10 pm to 6 am. Double-lane in both directions will be closed Monday to Thursday from 11 pm to 4 am and Sunday from 1 am to 7 am. Double-lane will be closed Friday from 11 pm to 7 am for northbound and from 11 pm to 5 am for southbound. The exit and entrance ramps along the north and southbound of the expressway may also be closed. These closures are necessary to facilitate roadway widening and will continue through July 14, 2025.

Van Wyck Expressway between Long Island Expressway and Pedestrian Bridge over Van Wyck Expressway

Single-lane in both directions will be closed Monday to Friday from 11 pm to 5 am. Double-lane will be closed Monday to Friday from 12:01 am to 6 am for southbound and from 12:01 am to 5:30 am for northbound. These closures are necessary to facilitate flood mitigations and will continue through June 30, 2024.

Van Wyck Expressway in the vicinity of Roosevelt Avenue Bridge

Single-lane northbound will be closed Monday to Friday from 9:30 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 9 pm to Saturday 12 pm, and Saturday 8 pm to Sunday 12 pm. Single-lane southbound will be closed Monday to Friday from 9:30 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 9 pm to Saturday 3 pm, and Saturday 8 pm to Sunday 3 pm. Double-lane northbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 7:30 am. Double-lane southbound will be closed Monday to Friday from 12:01 am to 6 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 9 am. At least one lane of traffic in each direction will be maintained at all times. These closures are necessary to facilitate reconstruction of Roosevelt Avenue Bridge and will continue through July 2, 2024.


Festivals, Parades and Events


LIC Waterfront 5K

The following streets will be closed for the LIC Waterfront 5K on Saturday June 1st, 2024 at the discretion of the NYPD in Queens.

Formation:

  • Center Blvd between Borden Avenue and 50th Avenue

Route:

  • Borden Avenue between Center Boulevard and Vernon Boulevard
  • Vernon Boulevard between Borden Avenue and 40th Avenue
  • 46th Avenue between Vernon Boulevard and 5th Street/Into the park

Dispersal:

  • Center Boulevard between 50th Avenue and Borden Avenue

Queens Pride Parade & Festival

The following streets will be closed for the Queens Pride Parade & Festival on Sunday June 2nd, 2024 in Queens.

Formation:

  • 89th Street between 35th Avenue and Roosevelt Avenue

Route:

  • 37th Avenue between 75th Street and 89th Street

Dispersal:

  • 75th Street between 37th Avenue and Roosevelt Avenue

Festival:

  • 75th -76th Street between 37th Avenue and Roosevelt Avenue
  • 37th Road between 74th Street and 77th Street

Staten Island

Iona Street between Father Capodanno Boulevard and Quincy Avenue

This street will be closed from 7 am to 6 pm Monday to Friday through 6/12/24 for full roadway closure.

Martling Avenue Bridge over Richmond Lake Dam

Sidewalks on both sides will be reduced to 6-feet, Monday to Friday from 7 am to 6 pm through May 31, 2024, to facilitate bridge rehabilitation. Two-way traffic will be maintained at all times.

Tompkins Avenue Bridge over Greenfield Avenue

Single-lane will be closed Monday to Friday from 7 am to 3:30 pm and from 10 pm to 6 am next morning, to facilitate bridge rehabilitation and will continue through June 17, 2024. Approximately eight to nine parking spaces will be eliminated. Two-way traffic will be maintained at all times.

Clarke Avenue between Arthur Kill Road and Tysen Court

This street will be closed from 8 pm to 5 am weeknights through 6/8/24 for critical utility work.

Information about scheduled maintenance and construction on MTA Bridges and Tunnels.

NYC DOT Weekend Traffic Advisory (2024)

References

Top Articles
Latest Posts
Article information

Author: Moshe Kshlerin

Last Updated:

Views: 6704

Rating: 4.7 / 5 (57 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Moshe Kshlerin

Birthday: 1994-01-25

Address: Suite 609 315 Lupita Unions, Ronnieburgh, MI 62697

Phone: +2424755286529

Job: District Education Designer

Hobby: Yoga, Gunsmithing, Singing, 3D printing, Nordic skating, Soapmaking, Juggling

Introduction: My name is Moshe Kshlerin, I am a gleaming, attractive, outstanding, pleasant, delightful, outstanding, famous person who loves writing and wants to share my knowledge and understanding with you.